Experimental controlled flood of 45,000 cfs conducted at Glen Canyon Dam

Upper Basin stakeholders, and WAPA in particular, were against the High Flow Experiment (HFE) plan–the next one was not conducted until 2003. (Potochnik) Some of their fears were assuaged when the same positive beach-building results were obtained the second time with less water than was released in the first HFE. Still, the third HFE was not conducted until 2008. (Around 2008, the nomenclature changed from “Beach Habitat Building Flow” to “High Flow Experiment”)

Reserve your detailing session

Select your preferred date and time and we will confirm your booking while taking care of everything else for you.

  • (217) 555-0134

  • hello@luxegloss.com

  • 517 West Main Street, Springfield, Illinois 62704

  • About
  • Archive
  • History